Boise Solid Concrete Contractor referrals · Treasure Valley

Concrete Contractors in Northwest Boise

Concrete driveways, RV pads, shop slabs and patios in Northwest Boise go in on a mix of old pasture lots, small-lot infill and foothill slopes north of State Street. Boise Solid Concrete connects homeowners with independent concrete contractors who work between the river and Hill Road. It does not pour. The area is small, about 3.5 percent of the city, but its ground changes quickly: floodplain near the river, flat lots in the middle, and slopes as it climbs north.

Backyard concrete patio with a new broom-finish section joined to the older covered slab, lawn and fence behind

Between the river and Hill Road

The Northwest planning area runs north from the Boise River and State Street to Hill Road, and west from 36th Street to Horseshoe Bend Road. It covers 2,286 acres, the second-smallest planning area, and had about 14,400 residents in some 6,250 households in 2010. Only two bridges, Glenwood Street and Veterans Memorial Parkway, cross the river here, and State Street is the main corridor. Landmarks include the 51-acre Optimist Youth Sports Complex and the Lake Harbor development south of State.

Pasture lots and infill

Remnants of rural large-lot living survive here, with about 166 acres of pasture and small farms when the plan was written. Sewer extensions opened the land between Gary Lane and Bogart Lane to subdivisions, and Collister has seen small-lot infill. On the bigger lots, requests run to long driveways, RV pads and outbuilding slabs; on infill lots, to tight driveways and back patios. A pad for an RV or trailer cannot sit in the required front or street-side setbacks, though gravel is allowed elsewhere on the lot.

Floodplain near the river

The city's plan notes floodplains along the Boise River within the Northwest. If your lot is near the river, find out whether it sits in a mapped floodplain before planning slabs, outbuildings or grade changes, and ask the city what review applies. River-bottom ground tends toward silty sands and gravels with shallow groundwater, so base depth and compaction deserve a direct question at the walk-through.

Slopes toward the foothills

North toward Hill Road the ground starts to climb. Where slopes exceed 15 percent, or where slope stability, groundwater or erosion is a concern, the city's hillside standards apply. Terraced yards bring retaining walls: a permit is required for a wall 4 feet or taller from the bottom of the footing, or a 2-foot wall holding back a slope or surcharge, which needs engineering. A patio more than 12 inches above grade also needs a building permit.

Nearby areas we cover

All areas: concrete contractor service areas.

Back to the main guide: Boise concrete contractors.

Free request

Get quotes from local concrete contractors

Tell us the city, the job and a rough size. Boise Solid Concrete passes the request to independent concrete contractors who work in that part of the Treasure Valley. They reach out to look at the site and quote in writing. Any agreement is between you and the contractor you pick.

  1. 1Send one requestCity, job and size. Photos help.
  2. 2A contractor follows upThey call or email to see the site and write a quote.
  3. 3You chooseHire, compare or walk away. You deal with the contractor directly.
(208) 591-6344

Get contractor quotes

Boise Solid Concrete is a referral service, not a licensed contractor. It is not registered as a contractor with the Idaho Division of Occupational and Professional Licenses and does not pour, repair or install concrete. Requests are passed to independent local concrete contractors, and each contractor is solely responsible for its own Idaho registration, work, permits, insurance, warranties and pricing. Sending this form shares your request with an independent concrete contractor who works in your area so they can contact you about the project. See the privacy policy.

Questions

Concrete questions people ask

Does a floodplain lot change a concrete project?

It can. Check whether your lot is in a mapped floodplain and ask the city what review applies before adding slabs, buildings or fill.

When does a retaining wall need a permit?

At 4 feet or more from the bottom of the footing, or at 2 feet if it holds back a slope or surcharge; those need engineering.

Can I add an RV pad on a large Northwest lot?

Generally yes, outside the required front and street-side setbacks. RVs and trailers may park on gravel there; concrete is the upgrade.

CallGet contractor quotes