Backyard Basketball Court Contractors in Boise, ID

A backyard concrete basketball court is a reinforced slab, usually 4 inches thick, poured flat with a light slope for drainage and paired with an in-ground hoop on its own footing. Boise Solid Concrete passes court requests to independent Treasure Valley concrete contractors. It does not pour. Size drives almost everything about the job, from cost to whether the yard can fit it at all.

Backyard half-court concrete basketball court with painted key lines and an in-ground glass-backboard hoop, bordered by lawn and a wood fence

Pick the size first

A regulation full court is 94 by 50 feet and a half court is 47 by 50, which is more yard than most subdivision lots have. Backyard courts are usually smaller; national guides price a common 30 by 30 foot backyard half court, and a smaller pad still fits a hoop and a key.

CourtSizeArea
Full court94 × 50 ft4,700 sq ft
Half court47 × 50 ft2,350 sq ft
Backyard half court30 × 30 ft900 sq ft

Leave run-off space past the lines, and check where the ball goes when it misses: a fence, a neighbor's window or the irrigation box.

The slab

Fixr describes a court slab as 4 inches of concrete reinforced with half-inch rebar. In a valley where most January nights freeze, the mix should be air-entrained, around 4,000 psi with a low water-to-cement ratio. Control joints are cut so shrinkage cracks follow them; on a 4-inch slab the usual spacing is about 8 to 12 feet, which on a court means planning the joint grid around the painted lines. Ask for a slight slope so water runs off instead of sitting and freezing on the court.

After the pour, the slab needs about a week of moist curing, and no deicers its first winter. Sealing helps keep water and brine out of the surface; see concrete sealing.

The hoop footing

An in-ground hoop sits on its own concrete footing, set before or alongside the slab. Manufacturer specs vary widely: Goalrilla calls for a hole 16 inches across and 48 inches deep with at least 72 hours of cure; Lifetime lists 21 to 24 inches deep. Boise's building code puts footings at least 24 inches below grade for frost, so follow the hoop maker's spec and never go shallower than local frost depth. Mark the hoop location on the plan so the slab, the footing and the court lines all agree.

What a court costs

National guides price the work in layers:

ItemNational range
Court slab (4 in, rebar)$4 to $10 per sq ft
Complete concrete court$4 to $20 per sq ft
30 × 30 backyard half court$3,600 to $14,400
Regulation half court, finished$15,500 to $40,000
In-ground hoop$400 to $3,600

Grading a sloped yard, access for the concrete truck, sport-court surfacing, fencing and lighting push a court toward the top of those ranges. For slab pricing by size and thickness, see the slab cost guide.

Back to the main guide: Boise concrete contractors.

Free request

Get quotes from local concrete contractors

Tell us the city, the job and a rough size. Boise Solid Concrete passes the request to independent concrete contractors who work in that part of the Treasure Valley. They reach out to look at the site and quote in writing. Any agreement is between you and the contractor you pick.

  1. 1Send one requestCity, job and size. Photos help.
  2. 2A contractor follows upThey call or email to see the site and write a quote.
  3. 3You chooseHire, compare or walk away. You deal with the contractor directly.
(208) 591-6344

Get contractor quotes

Boise Solid Concrete is a referral service, not a licensed contractor. It is not registered as a contractor with the Idaho Division of Occupational and Professional Licenses and does not pour, repair or install concrete. Requests are passed to independent local concrete contractors, and each contractor is solely responsible for its own Idaho registration, work, permits, insurance, warranties and pricing. Sending this form shares your request with an independent concrete contractor who works in your area so they can contact you about the project. See the privacy policy.

Questions

Basketball Courts: what people ask

How thick should a concrete basketball court be?

About 4 inches, reinforced with half-inch rebar, according to Fixr's court cost guide.

How big is a backyard half court?

A regulation half court is 47 by 50 feet. Many backyard courts are 30 by 30 feet, which national guides price at about $3,600 to $14,400.

How deep does a basketball hoop footing go?

It depends on the hoop: Goalrilla specifies 48 inches, Lifetime 21 to 24. In Boise, footings should reach at least the 24-inch frost depth.